03 0206_03 0205_2222018_045027.mp4
2.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
5.9 ft. - Surface Spalling, from 01 to 02 o'clock, within 8 inches of joint: NO - PEELING
58.4 ft. - General Observation - 30" VCP
90 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
101.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES
125.7 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES
142.4 ft. - Surface Spalling, from 08 to 10 o'clock, within 8 inches of joint: NO
164.4 ft. - Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: YES
164.4 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 4:50AM |
| 186.5 | DAGS | — |
| 186.9 | AMH | 5:35AM |
| 164.4 | SSS | — |
| 0 | MGO | Conn. @ Mh, 9 O' Clock. Capped |
| 0 | MWM | — |
| 186.5 | MGO | Conn. @ Mh, 3 O' Clock. OPEN |
| 5.9 | SSS | PEELING |
| 186.5 | SSS | — |
| 125.7 | SSS | — |
| 186.5 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 76.9 | FL | H |
| 173.9 | FC | H |
| 0 | MWL | — |
| 25.6 | DSGV | — |
| 58.4 | MGO | 30" VCP |
| 57.4 | FC | HAIRLINE |
| 142.4 | SSS | — |
| 90 | DAGS | — |
| 164.4 | SSS | — |
| 101.3 | SSS | — |
| 2.2 | SSS | — |
| 169.5 | DSZ | ROCK |