Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 31, 2018, 06:48 AM
  • 15 0759_15 0758 _30012018_230648.mp4

Date
01/30/2018
W/O
684713
Weather
Dry
Operator/Surveyor
K. ADAME
Sewer ID
Z00593
PipeID
P12960
Time
10:48 PM
Certificate
U-0817-07009000
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4860
Sewer Name
15 ARCADIA-SIERRA MADRE TRUNK, SECTS 2&5
City
ARCADIA, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
08
Purpose
Routine Assessment
Project
WO_684713_TV15146_FEB2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0759
Downstream MH
15 0758
Dir. of Survey
Downstream
Length Surveyed
327.6 ft.
Total Length
327.6 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 15 0759 to 15 0758
MH: 15 0759MH: 15 0758downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 07593.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start18.4 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"38.7 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 6"68.8 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 6"97.7 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: YES, 6"117.4 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 6"120.5 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 6"181.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"184.7 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: YES, 6"218.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"242.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"252.4 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: YES, 6"307.3 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 6"327.6 ft. AMH - Downstream Manhole, Survey Ends - 15 0758327.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish

Observation photos (1)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

    3.9 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

Observations (18)

DistanceCodeObservation
327.6AMH15 0758
3.9SAV
218.3TF
0MWL
0MWM
97.7TB
117.4TF
307.3TFC
120.5TFC
0AMH15 0759
38.7TF
252.4TB
184.7TB
181.7TFC
68.8TFC
242.6TF
18.4TB
327.6SAV

Properties (4)

additional_info
SC346884
custom_field_two
4
customer
LACSD
datetime
2018-01-30T22:48:46-08:00