Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 11, 2017, 12:09 PM
  • 18 0215_18 0214 _11122017_041007.mp4

Date
12/11/2017
W/O
673944
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00695
PipeID
P14041
Time
4:09 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5271
Sewer Name
18 ORR AND DAY ROAD TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
13
Purpose
Routine Assessment
Project
WO_673944_TV18100_DEC2017
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
18 0215
Downstream MH
18 0214
Dir. of Survey
Downstream
Length Surveyed
25.1 ft.
Total Length
25.2 ft.
Structural Index
4
Structural Quick
5434
Structural Rating
32
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
32
Pipe schematic from manhole 18 0215 to 18 0214
MH: 18 0215MH: 18 0214downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 02150 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 25 %of cross sectional area2.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start22.2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish24.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish25.1 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK25.2 ft. AMH - Downstream Manhole, Survey Ends - 18 0214

Observation photos (2)

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0AMH18 0215
24.2SAP
22.2SRV
25.2AMH18 0214
2.1SRV
2.1SAP
0MWL
0MGOCONNECTION AT MH 3 O'CLOCK
0MWM
25.1MGOCONNECTION AT MH 3 O'CLOCK

Properties (5)

additional_info
3
custom_field_two
2
customer
LACSD
datetime
2017-12-11T04:09:12-08:00
sewer_category