Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 3, 2015, 08:36 AM
  • 18 0662_18 0661_03092015_013629.mp4

Date
09/03/2015
W/O
521021
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00696
PipeID
P14511
Time
1:36 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K2674
Sewer Name
18 PHOEBE AVENUE TRUNK
City
LA MIRADA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_521021_TV18081_AUG2015
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Upstream MH
18 0662
Downstream MH
18 0661
Dir. of Survey
Downstream
Length Surveyed
301.5 ft.
Total Length
301.5 ft.
Structural Index
2
Structural Quick
3123
Structural Rating
9
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
13
Pipe schematic from manhole 18 0662 to 18 0661
MH: 18 0662MH: 18 0661downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 06620 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start45.7 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start74 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"78.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"117.4 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start126.5 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish174.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"179.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"193.3 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES198.3 ft. CL - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES204.2 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start280.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"298.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish298.9 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish298.9 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish301.5 ft. AMH - Downstream Manhole, Survey Ends - 18 0661

Observations (19)

DistanceCodeObservation
280.9TFC
298.9DAGS
2DAGS
204.2CM
179.5TFC
78.9TFC
174.7TFC
45.7DAE
298.9DAE
74TF
117.4CL
298.9CM
198.3CL
301.5AMH18 0661
0AMH18 0662
126.5CL
193.3CL
0MWM
0MWL

Properties (5)

additional_info
SC202947
custom_field_two
3
customer
LACSD
datetime
2015-09-03T01:36:23-07:00
sewer_category
GRAVITY