Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 13, 2018, 09:16 AM
  • Section#1_05 1287_05 1286__2132018__G6959.mp4

Date
02/13/2018
W/O
0689516
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00453
PipeID
P06500
Time
1:16 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6959
Sewer Name
05 GRAMERCY PLACE TRUNK, SECTION 1
City
GARDENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
21
Purpose
Routine Assessment
Project
20180213MDM_GRAMERCY_PLACE_TRUNK_SECTION_SECTION_1
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Upstream MH
05 1287
Downstream MH
05 1286
Dir. of Survey
Downstream
Length Surveyed
594.7 ft.
Total Length
594.7 ft.
Structural Index
3
Structural Quick
3X2V
Structural Rating
605
O&M Index
5
O&M Quick
5100
O&M Rating
5
Overall Index
3
Overall Quick
Overall Rating
610
Pipe schematic from manhole 05 1287 to 05 1286
MH: 05 1287MH: 05 1286downstream0 ft. AMH - Upstream Manhole, Survey Begins - 2:50AM0 ft. MWM - Water Mark, 80 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. MGO - General Observation - MAG COAT 95% 10:00 TO 2:00 START8 ft. MGP - General Photograph - MAG COAT22.7 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO, Start - BLISTERING CONCRETE UNDER MAG COAT57 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE59.2 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC85.6 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT106.6 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG128.9 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG207.8 ft. SAV - Surface Aggregate Visible, from 10 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG349 ft. SAV - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG506.2 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG594.3 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish594.3 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO, Finish - BLISTERING PEELING CONCRETE594.3 ft. MGO - General Observation - MAG COAT 95% FINISH594.3 ft. MGO - General Observation - MH CONN 3:00 ACTIVE594.3 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG594.7 ft. AMH - Downstream Manhole, Survey Ends - 3:45AM

Observation photos (11)

  • General Observation - MAG COAT 95% 10:00 TO 2:00 START

    2 ft. - General Observation - MAG COAT 95% 10:00 TO 2:00 START

  • General Photograph - MAG COAT

    8 ft. - General Photograph - MAG COAT

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO, Start - BLISTERING CONCRETE UNDER MAG COAT

    22.7 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO, Start - BLISTERING CONCRETE UNDER MAG COAT

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

    57 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

    59.2 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT

    85.6 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

    106.6 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

    128.9 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Visible, from 10 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG

    207.8 ft. - Surface Aggregate Visible, from 10 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG

    349 ft. - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    506.2 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

Observations (20)

DistanceCodeObservation
22.7SSSBLISTERING CONCRETE UNDER MAG COAT
2MGOMAG COAT 95% 10:00 TO 2:00 START
0AMH2:50AM
594.7AMH3:45AM
8MGPMAG COAT
594.3SAP
594.3SSSBLISTERING PEELING CONCRETE
59.2SAVSEVERE AGG SPORATIC
85.6SAVSEVERE AGG UNDER MAG COAT
57SSSBLISTERING PEELING CONCRETE
106.6SAVSEVERE AGG
349SAVSEVERE AGG
0MWM
128.9SAVSEVERE AGG
594.3MGOMAG COAT 95% FINISH
207.8SAVSEVERE AGG
594.3MGOMH CONN 3:00 ACTIVE
506.2SAPSEVERE AGG
0MWL
594.3SAVSEVERE AGG

Properties (4)

custom_field_three
SEVERE AGG PROJECTING
custom_field_two
3
customer
LACSD
datetime
2018-02-13T01:16:56-08:00