Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 7, 2018, 01:02 PM
  • Section#1_29 0338_29 0337__272018__G6952.mp4

Date
02/07/2018
W/O
#
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z01017
PipeID
P24357
Time
5:02 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6952
Sewer Name
29 PACIFIC COAST HIGHWAY SEWER
City
SIGNAL HILL
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Routine Assessment
Project
20180207MDM_PACFIC_COAST_HIGHWAY_SEWER
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
29 0338
Downstream MH
29 0337
Dir. of Survey
Downstream
Length Surveyed
371.6 ft.
Total Length
371.7 ft.
Structural Index
3
Structural Quick
3]22
Structural Rating
454
O&M Index
2
O&M Quick
2400
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
462
Pipe schematic from manhole 29 0338 to 29 0337
MH: 29 0338MH: 29 0337downstream0 ft. AMH - Upstream Manhole, Survey Begins - 5:05AM0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - MH CONN 9:00 ACTIVE2 ft. MMC - Material Change, Concrete pipe (non-reinfored)2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHT AGG -PEA AGG2 ft. SAP - Surface Aggregate Projecting, from 04 to 08 o'clock, within 8 inches of joint: YES, Start - SLIGHT AGG35.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - STUB86.4 ft. MGO - General Observation - 8" NRCP89.6 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN-90% GREASE133 ft. SAP - Surface Aggregate Projecting, from 04 to 08 o'clock, within 8 inches of joint: NO - SLIGHT AGG165.8 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN-80% GREASE172.3 ft. FC - Fracture Circumferential, from 01 to 02 o'clock, within 8 inches of joint: YES - SLIGHT176 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN192.7 ft. FL - Fracture Longitudinal, at 08 o'clock, within 8 inches of joint: YES - SLIGHT209.6 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE239.9 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN-50 GREASE250.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN313.5 ft. FC - Fracture Circumferential, from 09 to 10 o'clock, within 8 inches of joint: YES - SLIGHT332 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN334 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN-80% GREASE356.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN371.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SLIGHT AGG371.2 ft. SAP - Surface Aggregate Projecting, from 04 to 08 o'clock, within 8 inches of joint: YES, Finish - SLIGHT371.2 ft. MGO - General Observation - MH CONN 9:00 OPEN371.7 ft. AMH - Downstream Manhole, Survey Ends - 5:50AM

Observation photos (5)

  • Material Change, Concrete pipe (non-reinfored)

    2 ft. - Material Change, Concrete pipe (non-reinfored)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHT AGG -PEA AGG

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHT AGG -PEA AGG

  • Surface Aggregate Projecting, from 04 to 08 o'clock, within 8 inches of joint: YES, Start - SLIGHT AGG

    2 ft. - Surface Aggregate Projecting, from 04 to 08 o'clock, within 8 inches of joint: YES, Start - SLIGHT AGG

  • General Observation - 8" NRCP

    86.4 ft. - General Observation - 8" NRCP

  • Surface Aggregate Projecting, from 04 to 08 o'clock, within 8 inches of joint: NO - SLIGHT AGG

    133 ft. - Surface Aggregate Projecting, from 04 to 08 o'clock, within 8 inches of joint: NO - SLIGHT AGG

Observations (26)

DistanceCodeObservation
334TFDOPEN-80% GREASE
176TFOPEN
209.6TBACTIVE
250.1TFOPEN
35.3TFCSTUB
371.2SAVSLIGHT AGG
371.2SAPSLIGHT
2MMC
89.6TFDOPEN-90% GREASE
0AMH5:05AM
2SAVSLIGHT AGG -PEA AGG
192.7FLSLIGHT
86.4MGO8" NRCP
0MWM
2SAPSLIGHT AGG
313.5FCSLIGHT
356.9TFOPEN
332TBOPEN
0MWL
0MGOMH CONN 9:00 ACTIVE
371.2MGOMH CONN 9:00 OPEN
172.3FCSLIGHT
165.8TFDOPEN-80% GREASE
371.7AMH5:50AM
239.9TFDOPEN-50 GREASE
133SAPSLIGHT AGG

Properties (4)

custom_field_three
SLIGHT PROJECTING AGG
custom_field_two
3
customer
LACSD
datetime
2018-02-07T05:02:22-08:00