Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 5, 2018, 08:33 PM
  • 05 0024_05 0023_252018_133707.mp4

Date
02/05/2018
W/O
0674047
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00431
PipeID
P05309
Time
12:33 PM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7622
Sewer Name
05 DISTRICT #5 MAIN TRUNK
City
TORRANCE
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
27
Purpose
Capital Improvement Program Assesment
Project
20180205SHO_DISTRICT_5_MAIN_TRUNK
Material
RCP-CTL
Shape
Circular
Height
48 in.
Upstream MH
05 0024
Downstream MH
05 0023
Dir. of Survey
Downstream
Length Surveyed
333.1 ft.
Total Length
333.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 05 0024 to 05 0023
MH: 05 0024MH: 05 0023downstream0 ft. MWM - Water Mark, 45 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01400 ft. MWL - Water Level, 40 %of cross sectional area8 ft. MGO - General Observation - 95% MAG COAT INTACT294.3 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 8"333.1 ft. MGO - General Observation - CAPPED CONNECTION IN THE MH @ 9333.1 ft. AMH - Downstream Manhole, Survey Ends - 0155

Observations (7)

DistanceCodeObservation
0MWM
8MGO95% MAG COAT INTACT
0AMH0140
333.1MGOCAPPED CONNECTION IN THE MH @ 9
333.1AMH0155
294.3TFA
0MWL

Properties (5)

additional_info
RFIR
custom_field_three
95% MAG COAT INTACT
custom_field_two
4
customer
LACSD
datetime
2018-02-05T12:33:00-08:00