Wastewater/Activity/PacpInspection/1.0Feb 2, 2018, 08:26 PM
  • F 0252_F 0251_222018_125358.mp4

Date
02/02/2018
W/O
PENDING
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00035
PipeID
P10174
Time
12:26 PM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7620
Sewer Name
F JOINT OUTFALL F - UNIT 3A
City
CERRITOS
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
39
Purpose
Routine Assessment
Project
20180202SHO_JOINT_OUTFALL_F_UNIT_3A
Material
Reinforced Concrete Pipe
Shape
Circular
Height
81 in.
Upstream MH
F 0252
Downstream MH
F 0251
Dir. of Survey
Downstream
Length Surveyed
144.5 ft.
Total Length
144.5 ft.
Structural Index
4
Structural Quick
5231
Structural Rating
13
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
13
Pipe schematic from manhole F 0252 to F 0251
MH: F 0252MH: F 0251downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 12550 ft. MWL - Water Level, 20 %of cross sectional area16 ft. SRV - Surface Reinforcement Visible, from 11 to 03 o'clock, within 8 inches of joint: YES, Start16 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO, Start130.5 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO, Finish130.6 ft. SRV - Surface Reinforcement Visible, from 11 to 03 o'clock, within 8 inches of joint: YES, Finish139.1 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: NO144.5 ft. AMH - Downstream Manhole, Survey Ends - 0105

Observation photos (3)

  • Surface Reinforcement Visible, from 11 to 03 o'clock, within 8 inches of joint: YES, Start

    16 ft. - Surface Reinforcement Visible, from 11 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO, Start

    16 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO, Start

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: NO

    139.1 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: NO

Observations (9)

DistanceCodeObservation
16SRV
130.6SRV
0MWM
139.1SRV
130.5SAP
144.5AMH0105
16SAP
0AMH1255
0MWL

Properties (4)

custom_field_three
VISIBLE REBAR AND VISIBLE AGG.
custom_field_two
2
customer
LACSD
datetime
2018-02-02T12:26:39-08:00