Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 8, 2018, 08:48 AM
  • 29 0345_29 0322_282018_030220.mp4

Date
02/08/2018
W/O
0688890
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z01017
PipeID
P24340
Time
12:48 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0733
Sewer Name
29 PACIFIC COAST HIGHWAY SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Capital Improvement Program Assesment
Project
20140208MDM_PACFIC_COAST_HIGHWAY_SEWER
Material
NRCP
Shape
Circular
Height
8 in.
Upstream MH
29 0345
Downstream MH
29 0322
Dir. of Survey
Downstream
Length Surveyed
487.8 ft.
Total Length
487.8 ft.
Structural Index
3
Structural Quick
513A
Structural Rating
37
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
41
Pipe schematic from manhole 29 0345 to 29 0322
MH: 29 0345MH: 29 0322downstream0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:10AM0 ft. MWM - Water Mark, 10 %of cross sectional area0.7 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG8 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: NO - SEVERE AGG8 ft. MGO - General Observation - 8" NRCP46.5 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES - SEVERE AGG142 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open189.5 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG189.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - MODERATE AGG256.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open278.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHT AGG278.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - MODERATE278.4 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start - MODERATE344.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG359.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open417.1 ft. FL - Fracture Longitudinal, at 09 o'clock, within 8 inches of joint: YES - HAIRLINE436.2 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES - MODERATE AGG456.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start467.1 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start467.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish468.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG482.1 ft. B - Broken, from 09 to 12 o'clock, within 8 inches of joint: YES - SLIGHT FRACTURE483.5 ft. MWLS - Water Level, Sag in pipe, 30 %of cross sectional area487.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG487.3 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active487.3 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish487.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SLIGHT487.3 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish - MODERATE487.8 ft. AMH - Downstream Manhole, Survey Ends - 4:00AM

Observation photos (13)

  • Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    0.7 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: NO - SEVERE AGG

    8 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • General Observation - 8" NRCP

    8 ft. - General Observation - 8" NRCP

  • Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES - SEVERE AGG

    46.5 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - MODERATE AGG

    189.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - MODERATE AGG

  • Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start - MODERATE

    278.4 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start - MODERATE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    344.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES - MODERATE AGG

    436.2 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES - MODERATE AGG

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    456.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    467.1 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    468.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Broken, from 09 to 12 o'clock, within 8 inches of joint: YES - SLIGHT FRACTURE

    482.1 ft. - Broken, from 09 to 12 o'clock, within 8 inches of joint: YES - SLIGHT FRACTURE

  • Water Level, Sag in pipe, 30 %of cross sectional area

    483.5 ft. - Water Level, Sag in pipe, 30 %of cross sectional area

Observations (31)

DistanceCodeObservation
142TFOpen
467.1DAGS
482.1BSLIGHT FRACTURE
483.5MWLS
487.3SAPSEVERE AGG
436.2SAPMODERATE AGG
0.7SAPSEVERE AGG
8SAPSEVERE AGG
468.8SAPSEVERE AGG
0MGOConn. @ Mh, 3 O' Clock. Active
256.9TFOpen
417.1FLHAIRLINE
456.6DAGS
278.4SAPSLIGHT AGG
0MWL
189.5SAPSEVERE AGG
344.7SAPSEVERE AGG
487.3MGOConn. @ Mh, 3 O' Clock. Active
46.5SAPSEVERE AGG
0AMH3:10AM
487.3DAGS
359.8TFOpen
0MWM
487.3SAPSLIGHT
278.4SAPMODERATE
8MGO8" NRCP
487.8AMH4:00AM
278.4SAPMODERATE
487.3SAPMODERATE
467.1DAGS
189.5SAPMODERATE AGG

Properties (4)

custom_field_three
SEVERE AGG PROJECTING -POSSIBLY MISSING
custom_field_two
2
customer
LACSD
datetime
2018-02-08T00:48:57-08:00