Wastewater/Activity/PacpInspection/1.0Jan 26, 2018, 07:47 AM
  • 20 0124_20 0123 _26012018_000204.mp4

Date
01/25/2018
W/O
684819
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00744
PipeID
P19047
Time
11:47 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5387
Sewer Name
20 TRUNK "C"
City
PALMDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
01
Purpose
Routine Assessment
Project
WO_684819_TV20027_FEB2018
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0124
Downstream MH
20 0123
Dir. of Survey
Downstream
Length Surveyed
391.1 ft.
Total Length
391.1 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
385
O&M Index
2
O&M Quick
2N00
O&M Rating
154
Overall Index
2
Overall Quick
Overall Rating
539
Pipe schematic from manhole 20 0124 to 20 0123
MH: 20 0124MH: 20 0123downstream0 ft. AMH - Upstream Manhole, Survey Begins - 20 01240 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start38.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"43.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"136 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"140.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"237.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"241.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"338 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"342.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"389.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish389.1 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish389.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish391.1 ft. AMH - Downstream Manhole, Survey Ends - 20 0123

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
2SAP
0AMH20 0124
389.1SAP
338TFC
2DAGS
389.1DAGS
389.1SSS
391.1AMH20 0123
241.5TFC
38.8TFC
43.1TFC
140.2TFC
237.4TFC
342.2TFC
136TFC
2SSS
0MWL

Properties (5)

additional_info
SC346966
custom_field_two
2
customer
LACSD
datetime
2018-01-25T23:47:28-08:00
sewer_category