Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 23, 2018, 08:39 AM
  • 14 0505_14 0504_23012018_005705.mp4

Date
01/23/2018
W/O
682268
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00579
PipeID
P18594
Time
12:39 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5382
Sewer Name
14 TRUNK "C"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
19
Purpose
Routine Assessment
Project
WO_682268_TV14021_JAN2018
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0505
Downstream MH
14 0504
Dir. of Survey
Downstream
Length Surveyed
391.2 ft.
Total Length
391.2 ft.
Structural Index
3
Structural Quick
3O2O
Structural Rating
390
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
394
Pipe schematic from manhole 14 0505 to 14 0504
MH: 14 0505MH: 14 0504downstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 05050 ft. MWM - Water Mark, 60 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start11.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"35.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"59.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"87.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"112.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"136.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"160.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"184.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"209.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"237.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"262.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"286.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"310.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"334.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"390 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish390 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish391.2 ft. AMH - Downstream Manhole, Survey Ends - 14 0504391.2 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

Observation photos (2)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (23)

DistanceCodeObservation
237.5TFC
209.4TFC
391.2AMH14 0504
391.2MGOACTIVE CONNECTION AT MH 3 O'CLOCK
59.6TFC
334.6TFC
390SAP
112.2TFC
310.6TFC
11.1TFC
35.6TFC
2SSS
286.3TFC
160.3TFC
0MWL
390SSS
136.5TFC
184.9TFC
0AMH14 0505
0MWM
2SAP
87.6TFC
262.1TFC

Properties (5)

additional_info
SC346961
custom_field_two
3
customer
LACSD
datetime
2018-01-23T00:39:31-08:00
sewer_category