Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 22, 2018, 11:03 AM
  • J 0050_J 0048 _22012018_031619.mp4

Date
01/22/2018
W/O
679391
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00062
PipeID
P11627
Time
3:03 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5414
Sewer Name
J JOINT OUTFALL J - UNIT 2C
City
LOMITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
32
Purpose
Routine Assessment
Project
WO_679391_TV05287_JAN2018
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
42 in.
Upstream MH
J 0050
Downstream MH
J 0048
Dir. of Survey
Downstream
Length Surveyed
568.2 ft.
Total Length
568.2 ft.
Structural Index
3
Structural Quick
3V00
Structural Rating
345
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
345
Pipe schematic from manhole J 0050 to J 0048
MH: J 0050MH: J 0048downstream0 ft. AMH - Upstream Manhole, Survey Begins - J 00500 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2.1 ft. MGO - General Observation - MAG COAT2.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start222.2 ft. SAP - Surface Aggregate Projecting, at 09 o'clock, within 8 inches of joint: YES465.4 ft. SAP - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: YES568.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish568.2 ft. AMH - Downstream Manhole, Survey Ends - J 0048568.2 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, at 09 o'clock, within 8 inches of joint: YES

    222.2 ft. - Surface Aggregate Projecting, at 09 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: YES

    465.4 ft. - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: YES

Observations (10)

DistanceCodeObservation
2.1MGOMAG COAT
568.2SAV
465.4SAP
222.2SAP
0AMHJ 0050
568.2AMHJ 0048
568.2MGOCONNECTION AT MH 9 O'CLOCK
0MWM
0MWL
2.1SAV

Properties (5)

additional_info
SC346798
custom_field_two
3
customer
LACSD
datetime
2018-01-22T03:03:49-08:00
sewer_category
Gravity