Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 9, 2018, 11:12 AM
  • 22 0266_22 0265_09012018_031231.mp4

Date
01/09/2018
W/O
679393
Weather
Light Rain
Operator/Surveyor
B.FUGATE
Sewer ID
Z00793
PipeID
P16549
Time
3:12 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5408
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
WO_679393_TV22016_JAN2018
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0266
Downstream MH
22 0265
Dir. of Survey
Downstream
Length Surveyed
438.6 ft.
Total Length
438.7 ft.
Structural Index
3
Structural Quick
3P2E
Structural Rating
325
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
3
Overall Quick
Overall Rating
326
Pipe schematic from manhole 22 0266 to 22 0265
MH: 22 0266MH: 22 0265downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02660 ft. MWL - Water Level, 10 %of cross sectional area2.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.2 ft. MGO - General Observation - MAG COAT43.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"96.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"145.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"153.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"161.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"161.8 ft. RFL - Roots Fine Lateral, at 10 o'clock198.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"247.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"273 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start296.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"316.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"348.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"393.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"398 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"430.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"433 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish438.7 ft. AMH - Downstream Manhole, Survey Ends - 22 0265438.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (23)

DistanceCodeObservation
2.2SAP
398TFC
393.6TFC
145.4TFC
0MWM
2.2MGOMAG COAT
438.7AMH22 0265
0AMH22 0266
430.7TF
161.8TF
316.4TF
433SSS
273SSS
247.2TFC
0MWL
296.1TFC
161.8RFL
96.6TFC
348.8TFC
153.6TF
43.3TFC
198.2TFC
438.7SAP

Properties (5)

additional_info
SC346782
custom_field_two
2
customer
LACSD
datetime
2018-01-09T03:12:16-08:00
sewer_category
Gravity