Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 11, 2018, 09:07 AM
  • 22 0243_22 0242 _11012018_010734.mp4

Date
01/11/2018
W/O
679393
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00793
PipeID
P16525
Time
1:07 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5411
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
WO_679393_TV22016_JAN2018
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0243
Downstream MH
22 0242
Dir. of Survey
Downstream
Length Surveyed
332 ft.
Total Length
332.1 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 22 0243 to 22 0242
MH: 22 0243MH: 22 0242downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02432.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start16.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"50.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"70.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"95.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"120.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"153.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"199.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"203.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"228.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"297 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"300.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"332.1 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK332.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish332.1 ft. AMH - Downstream Manhole, Survey Ends - 22 0242332.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
297TFC
0MWM
332.1MGOCONNECTION AT MH 9 O'CLOCK
332.1SAP
300.6TFC
50.2TFC
332.1AMH22 0242
153.4TFC
332.1SSS
203.6TFC
70.7TFC
199.6TFC
0MWL
2.1SAP
95.5TF
228.1TFC
16.4TF
120.8TF
0AMH22 0243
2.1SSS

Properties (5)

additional_info
SC346785
custom_field_two
2
customer
LACSD
datetime
2018-01-11T01:07:15-08:00
sewer_category
Gravity