Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 11, 2018, 10:48 AM
  • 22 0237_22 0236 _11012018_024827.mp4

Date
01/11/2018
W/O
679679
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00793
PipeID
P16519
Time
2:48 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5410
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
WO_679679_TV22160_JAN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0237
Downstream MH
22 0236
Dir. of Survey
Downstream
Length Surveyed
305.5 ft.
Total Length
305.5 ft.
Structural Index
3
Structural Quick
3K00
Structural Rating
180
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
180
Pipe schematic from manhole 22 0237 to 22 0236
MH: 22 0237MH: 22 0236downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 02370 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 40 %of cross sectional area3.8 ft. MGO - General Observation - MAG COAT3.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start48.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"51.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"86.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"133.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"182.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"200.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"268.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"305.5 ft. AMH - Downstream Manhole, Survey Ends - 22 0236305.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish305.5 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
0AMH22 0237
48.1TFC
0MWL
3.8MGOMAG COAT
305.5AMH22 0236
305.5SAP
305.5MGOCONNECTION AT MH 9 O'CLOCK
0MGOCONNECTION AT MH 3 O'CLOCK
3.8SAP
0MGOCONNECTION AT MH 9 O'CLOCK
0MWM
133.6TFC
182.3TFC
200.6TFC
268.4TFC
86.1TFC
51.8TFC

Properties (4)

additional_info
SC346784
custom_field_two
3
customer
LACSD
datetime
2018-01-11T02:48:05-08:00