Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 9, 2018, 09:24 AM
  • 22 0278_22 0277 _09012018_012451.mp4

Date
01/09/2018
W/O
679260
Weather
Light Rain
Operator/Surveyor
B.FUGATE
Sewer ID
Z00793
PipeID
P16564
Time
1:24 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5407
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
WO_679260_TV22014_JAN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0278
Downstream MH
22 0277
Dir. of Survey
Downstream
Length Surveyed
156.4 ft.
Total Length
156.4 ft.
Structural Index
3
Structural Quick
423E
Structural Rating
163
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
163
Pipe schematic from manhole 22 0278 to 22 0277
MH: 22 0278MH: 22 0277downstream0 ft. MGO - General Observation - CONNECTION AT MH 5 O'CLOCK0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 6 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 22 02780 ft. MWL - Water Level, 5 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES5.3 ft. FM - Fracture Multiple, from 07 to 10 o'clock, within 8 inches of joint: YES23.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"156.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish156.4 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK156.4 ft. AMH - Downstream Manhole, Survey Ends - 22 0277156.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    2.1 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 07 to 10 o'clock, within 8 inches of joint: YES

    5.3 ft. - Fracture Multiple, from 07 to 10 o'clock, within 8 inches of joint: YES

Observations (14)

DistanceCodeObservation
156.4MGOCONNECTION AT MH 3 O'CLOCK
0MGOCONNECTION AT MH 5 O'CLOCK
2.1SSS
0MWM
23.7TFC
0MGOCONNECTION AT MH 6 O'CLOCK
2.1FM
2SAP
5.3FM
0AMH22 0278
0MWL
156.4AMH22 0277
156.4SSS
156.3SAP

Properties (4)

additional_info
SC346781
custom_field_two
2
customer
LACSD
datetime
2018-01-09T01:24:02-08:00