Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 8, 2018, 11:50 AM
  • 22 0293_22 0292_08012018_035036.mp4

Date
01/08/2018
W/O
679260
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00793
PipeID
P16579
Time
3:50 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5406
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
32
Purpose
Routine Assessment
Project
WO_679260_TV22014_JAN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0292
Downstream MH
22 0293
Dir. of Survey
Upstream
Length Surveyed
351.3 ft.
Total Length
351.3 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
351
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
351
Pipe schematic from manhole 22 0292 to 22 0293
MH: 22 0292MH: 22 0293upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 02930 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK1.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish65.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"73.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"92.8 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES138.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"142.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"166.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES219.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"224.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"231.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"348.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start348.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start351.3 ft. AMH - Downstream Manhole, Survey Begins - 22 0292351.3 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK351.3 ft. MWL - Water Level, 5 %of cross sectional area351.3 ft. MWM - Water Mark, 15 %of cross sectional area

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    184.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    258.5 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (19)

DistanceCodeObservation
0AMH22 0292
0MGOCONNECTION AT MH 9 O'CLOCK
286.2TF
131.4TF
2.5SAP
278TF
0MWL
349.4SAP
0MWM
351.3AMH22 0293
127.1TF
258.5CM
212.6TF
351.3MGOCONNECTION AT MH 9 O'CLOCK
2.5SSS
208.5TF
119.4TFC
184.8CM
349.6SSS

Properties (4)

additional_info
SC346780
custom_field_two
2
customer
LACSD
datetime
2018-01-08T03:50:17-08:00