A 0420_A 0419_16012018_122707.mp4
1.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
29.7 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start
85.5 ft. - Roots Fine Joint, from 10 to 02 o'clock, within 8 inches of joint: YESR
90.2 ft. - Roots Medium Joint, from 12 to 04 o'clock, 15 %, within 8 inches of joint: YESR
102.6 ft. - Roots Fine Joint, from 10 to 02 o'clock, within 8 inches of joint: YESR
105.4 ft. - Roots Ball Joint, from 09 to 03 o'clock, 55 %, within 8 inches of joint: YES
109.9 ft. - Roots Medium Joint, from 09 to 03 o'clock, 40 %, within 8 inches of joint: YESR
117 ft. - Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
133.7 ft. - Roots Medium Joint, from 09 to 03 o'clock, 15 %, within 8 inches of joint: YESR, Start
145.9 ft. - Roots Medium Joint, from 09 to 03 o'clock, 15 %, within 8 inches of joint: YESR, Finish
149.9 ft. - Roots Medium Joint, from 09 to 03 o'clock, 20 %, within 8 inches of joint: YESR
| Distance | Code | Observation |
|---|---|---|
| 85.5 | RFJ | — |
| 352.7 | SSS | — |
| 105.4 | RBJ | — |
| 90.2 | RMJ | — |
| 117 | RFJ | — |
| 352.7 | DAE | — |
| 0 | AMH | A 0420 |
| 224.3 | DSZ | SLUDGE |
| 109.9 | RMJ | — |
| 0 | MWL | — |
| 0 | MWM | — |
| 102.6 | RFJ | — |
| 149.9 | RMJ | — |
| 133.7 | RMJ | — |
| 352.7 | RFJ | — |
| 1.5 | SSS | — |
| 354.1 | AMH | A 0419 |
| 29.7 | DAE | — |
| 7 | DSZ | SLUDGE |
| 145.9 | RMJ | — |