Wastewater/Activity/PacpInspection/1.0Jan 2, 2018, 12:49 PM
  • 01 0336_01 0335_01022018_045002.mp4

Date
01/02/2018
W/O
679271
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00215
PipeID
P00806
Time
4:49 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5362
Sewer Name
01 NADEAU TRUNK, SECTS 2&1
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
06
Purpose
Routine Assessment
Project
WO_679271_TV01126_JAN2018
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
01 0336
Downstream MH
01 0335
Dir. of Survey
Downstream
Length Surveyed
182.6 ft.
Total Length
182.6 ft.
Structural Index
3
Structural Quick
3F00
Structural Rating
108
O&M Index
2
O&M Quick
412F
O&M Rating
76
Overall Index
3
Overall Quick
Overall Rating
184
Pipe schematic from manhole 01 0336 to 01 0335
MH: 01 0336MH: 01 0335downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 03360 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - MAG COATING 80%2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start181.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish181.6 ft. MGO - General Observation - COCKROACHES IN MANHOLE181.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish182.6 ft. AMH - Downstream Manhole, Survey Ends - 01 0335

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
2DAGS
181.6SAP
0MWL
2SAP
181.6MGOCOCKROACHES IN MANHOLE
182.6AMH01 0335
0AMH01 0336
0MWM
181.6DAGS
0MGOMAG COATING 80%

Properties (5)

additional_info
SC346439
custom_field_two
2
customer
LACSD
datetime
2018-01-02T04:49:20-08:00
sewer_category
Gravity