Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 2, 2018, 11:07 AM
  • 01 0329_01 0328_01022018_030801.mp4

Date
01/02/2018
W/O
679271
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00215
PipeID
P00799
Time
3:07 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5362
Sewer Name
01 NADEAU TRUNK, SECTS 2&1
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
07
Purpose
Routine Assessment
Project
WO_679271_TV01126_JAN2018
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
01 0329
Downstream MH
01 0328
Dir. of Survey
Downstream
Length Surveyed
333.8 ft.
Total Length
333.8 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
198
O&M Index
2
O&M Quick
412L
O&M Rating
136
Overall Index
3
Overall Quick
Overall Rating
334
Pipe schematic from manhole 01 0329 to 01 0328
MH: 01 0329MH: 01 0328downstream0 ft. MGO - General Observation - MAG COATING 80%0 ft. AMH - Upstream Manhole, Survey Begins - 01 03290 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start331.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish331.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish333.8 ft. AMH - Downstream Manhole, Survey Ends - 01 0328

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
0MGOMAG COATING 80%
0AMH01 0329
331.9SAP
2SAP
333.8AMH01 0328
331.9DAGS
0MWL
0MWM
0DAGS

Properties (5)

additional_info
SC346439
custom_field_two
2
customer
LACSD
datetime
2018-01-02T03:07:41-08:00
sewer_category
Gravity