Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 2, 2018, 12:25 PM
  • 01 0337_01 0336_01022018_042652.mp4

Date
01/02/2018
W/O
679271
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00215
PipeID
P00807
Time
4:25 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5362
Sewer Name
01 NADEAU TRUNK, SECTS 2&1
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
06
Purpose
Routine Assessment
Project
WO_679271_TV01126_JAN2018
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
01 0336
Downstream MH
01 0337
Dir. of Survey
Upstream
Length Surveyed
292.3 ft.
Total Length
292.3 ft.
Structural Index
3
Structural Quick
3K00
Structural Rating
174
O&M Index
2
O&M Quick
412K
O&M Rating
120
Overall Index
3
Overall Quick
Overall Rating
294
Pipe schematic from manhole 01 0336 to 01 0337
MH: 01 0336MH: 01 0337upstream0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Ends - 01 03370.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish0.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish290.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start290.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start292.3 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK292.3 ft. MGO - General Observation - MAG COATING 80%292.3 ft. AMH - Downstream Manhole, Survey Begins - 01 0336292.3 ft. MWM - Water Mark, 50 %of cross sectional area292.3 ft. MWL - Water Level, 25 %of cross sectional area

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
292.3MGOACTIVE CONNECTION AT MH 3 O'CLOCK
291.9DAGS
0MGOMAG COATING 80%
2DAGS
0AMH01 0336
292.3AMH01 0337
2SAP
0MWM
291.9SAP
0MWL

Properties (5)

additional_info
SC346439
custom_field_two
2
customer
LACSD
datetime
2018-01-02T04:25:28-08:00
sewer_category
Gravity