Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 28, 2017, 09:56 AM
  • 14 0170_14 0169_12282017_015705.mp4

Date
12/28/2017
W/O
678026
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00584
PipeID
P18208
Time
1:56 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5357
Sewer Name
14 WEST SIDE TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
WO_678026_DISTRICT14_DEC2017
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0170
Downstream MH
14 0169
Dir. of Survey
Downstream
Length Surveyed
202.2 ft.
Total Length
202.2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
413B
O&M Rating
128
Overall Index
2
Overall Quick
Overall Rating
128
Pipe schematic from manhole 14 0170 to 14 0169
MH: 14 0170MH: 14 0169downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 01702 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"13.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"55.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"62.1 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"89.7 ft. MWL - Water Level, 50 %of cross sectional area98.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"115.5 ft. TBC - Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6"122.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"128.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"133.1 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS179 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"184.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"201.4 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish201.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish202.2 ft. AMH - Downstream Manhole, Survey Ends - 14 0169

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Water Level, 50 %of cross sectional area

    89.7 ft. - Water Level, 50 %of cross sectional area

Observations (19)

DistanceCodeObservation
55.9TFC
202.2AMH14 0169
179TFC
98.3TFC
122.3TFC
133.1DSZDEBRIS
0MWL
115.5TBC
201.4DSZ
128.4TFA
0MWM
13.4TFA
8TFC
62.1TFA
0AMH14 0170
184.4TFC
89.7MWL
2DAGS
201.4DAGS

Properties (5)

additional_info
SC346434
custom_field_two
3
customer
LACSD
datetime
2017-12-28T01:56:19-08:00
sewer_category
Gravity