Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 6, 2017, 09:37 AM
  • B 0409_B 0408 _06122017_024518.mp4

Date
12/06/2017
W/O
673987
Weather
Dry
Operator/Surveyor
ERUIZ
Sewer ID
Z00092
PipeID
P08921
Time
1:37 AM
Certificate
123456
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5153
Sewer Name
B JOINT OUTFALL B - UNIT 5B
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
07
Purpose
Routine Assessment
Project
WO_673987_TV15135_DEC2017
Material
NRCP
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
B 0409
Downstream MH
B 0408
Dir. of Survey
Downstream
Length Surveyed
401.2 ft.
Total Length
401.2 ft.
Structural Index
4
Structural Quick
4131
Structural Rating
7
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
7
Pipe schematic from manhole B 0409 to B 0408
MH: B 0409MH: B 0408downstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 04095 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start15.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"31.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"89 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"112.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"155.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish155.7 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start169.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"177.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"217.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"250.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"253.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"306.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"314.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"396.4 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish401.2 ft. AMH - Downstream Manhole, Survey Ends - B 0408401.2 ft. MGO - General Observation - LATERAL AT MH 3 OCLOCK, POSSIBLY OBSTRUCTED

Observation photos (2)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    5 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    155.7 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
250.1TFC
31.7TFC
0MWL
5SAP
15.1TFC
314.6TF
169.4TFC
401.2AMHB 0408
155.7SAM
0MWM
89TF
155.6SAP
112.6TFC
401.2MGOLATERAL AT MH 3 OCLOCK, POSSIBLY OBSTRUCTED
217.6TFC
253.7TF
0AMHB 0409
306.3TF
177.7TF
396.4SAM

Properties (5)

additional_info
SC346463
custom_field_two
2
customer
LACSD
datetime
2017-12-06T01:37:54-08:00
sewer_category
Gravity