- Date
- 12/19/2017
- W/O
- 679304
- Weather
- Dry
- Operator/Surveyor
- B.FUGATE
- Sewer ID
- Z00283
- PipeID
- P04190
- Time
- 1:12 AM
- Certificate
- U-508-7069
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- No Pre-Cleaning
- Media Label
- K5282
- Sewer Name
- 02 MONTEBELLO INTERCEPTOR TRUNK, SECTS 1&2
- City
- MONTEBELLO
- Loc. details
- Main Highway - Urban
- Location Code
- A
- Use of Sewer
- Sanitary Sewer
- District
- District 02
- Page No.
- 18
- Purpose
- Routine Assessment
- Project
- WO_679304_TV02213_JAN2018
- Sewer Type
- Gravity
- Material
- Reinforced Concrete Pipe
- Shape
- Circular
- Height
- 30 in.
- Width
- 30 in.
- Upstream MH
- 02 1845
- Downstream MH
- 02 1844
- Dir. of Survey
- Downstream
- Length Surveyed
- 436 ft.
- Total Length
- 436 ft.
- Structural Index
- 3
- Structural Quick
- 5D3P
- Structural Rating
- 560
- O&M Index
- 0
- O&M Quick
- 0000
- O&M Rating
- 0
- Overall Index
- 3
- Overall Quick
- —
- Overall Rating
- 560
Pipe schematic from manhole 02 1845 to 02 1844 Observation photos (3)

6.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

6.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

24.9 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start