Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 20, 2017, 08:56 AM
  • 02 1212_02 2139_20122017_005637.mp4

Date
12/20/2017
W/O
679300
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00284
PipeID
P04414
Time
12:56 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5285
Sewer Name
02 MONTEBELLO INTERCEPTOR TRUNK, SECTION 3
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
14
Purpose
Routine Assessment
Project
WO_679300_TV02296_JAN2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
02 1212
Downstream MH
02 2139
Dir. of Survey
Downstream
Length Surveyed
179.9 ft.
Total Length
180 ft.
Structural Index
4
Structural Quick
5D3F
Structural Rating
222
O&M Index
3
O&M Quick
3D00
O&M Rating
69
Overall Index
4
Overall Quick
Overall Rating
291
Pipe schematic from manhole 02 1212 to 02 2139
MH: 02 1212MH: 02 2139downstream0 ft. MGO - General Observation - CONNECTION AT MH 6 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 02 12120 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 10 %of cross sectional area2.2 ft. MGO - General Observation - MAG COAT6.4 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start54.1 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start59.5 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start173.6 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish173.6 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Finish177 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish180 ft. AMH - Downstream Manhole, Survey Ends - 02 2139180 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (3)

  • Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    6.4 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    54.1 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  15 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: YES, Start

    59.5 ft. - Deposits Settled Other, 15 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
0MGOCONNECTION AT MH 6 O'CLOCK
54.1SRV
177SAP
0AMH02 1212
6.4SAP
173.6SRV
173.6DSZ
2.2MGOMAG COAT
0MWM
180AMH02 2139
180MGOCONNECTION AT MH 3 O'CLOCK
0MGOCONNECTION AT MH 9 O'CLOCK
59.5DSZ
0MWL

Properties (5)

additional_info
SC346762
custom_field_two
2
customer
LACSD
datetime
2017-12-20T00:56:28-08:00
year_laid
30538