Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 6, 2018, 09:02 AM
  • Section#9_05 0284_05 0283__162018__G6907.mp4

Date
01/06/2018
W/O
0682489
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00498
PipeID
P05492
Time
1:02 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6907
Sewer Name
05 OAK STREET-CENTER AVENUE TRUNK
City
INGLEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
10
Purpose
Capital Improvement Program Assesment
Project
20180105MDM_OAK_STREET_CENTER_AVENUE_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
05 0284
Downstream MH
05 0283
Dir. of Survey
Downstream
Length Surveyed
322.6 ft.
Total Length
322.6 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
325
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
325
Pipe schematic from manhole 05 0284 to 05 0283
MH: 05 0284MH: 05 0283downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - MH CONN 9:00 ACTIVE0 ft. MGO - General Observation - MH CONN 3:00 ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 1:50AM0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG15 ft. MGO - General Observation - 27" RCP188 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG254.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - BLISTERING CONCRETE322.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG322.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE322.2 ft. MGO - General Observation - MH CONN 3:00 ACTIVE322.2 ft. MGO - General Observation - MH CONN 9:00 ACTIVE322.6 ft. AMH - Downstream Manhole, Survey Ends - 2:50AM

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • General Observation - 27" RCP

    15 ft. - General Observation - 27" RCP

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    188 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - BLISTERING CONCRETE

    254.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - BLISTERING CONCRETE

Observations (15)

DistanceCodeObservation
15MGO27" RCP
0MWL
2SSSBLISTERING PEELING CONCRETE
0MGOMH CONN 9:00 ACTIVE
254.5SSSBLISTERING CONCRETE
322.6AMH2:50AM
322.2SAPSEVERE AGG
322.2SSSBLISTERING PEELING CONCRETE
2SAPSEVERE AGG
322.2MGOMH CONN 3:00 ACTIVE
322.2MGOMH CONN 9:00 ACTIVE
0MGOMH CONN 3:00 ACTIVE
188SAPSEVERE AGG
0AMH1:50AM
0MWM

Properties (4)

custom_field_three
SEVERE AGG PROJECTING
custom_field_two
3
customer
LACSD
datetime
2018-01-06T01:02:31-08:00