Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 20, 2017, 08:16 AM
  • 02 1084_02 1083 _20122017_002256.mp4

Date
12/20/2017
W/O
679272
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00282
PipeID
P03658
Time
12:16 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5284
Sewer Name
02 MONTEBELLO DIVERSION TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
18
Purpose
Routine Assessment
Project
WO_679272_TV02212_JAN2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 1083
Downstream MH
02 1084
Dir. of Survey
Upstream
Length Surveyed
335.2 ft.
Total Length
335.2 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
330
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
330
Pipe schematic from manhole 02 1083 to 02 1084
MH: 02 1083MH: 02 1084upstream0 ft. AMH - Upstream Manhole, Survey Ends - 02 10840.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish28.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"77 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"125.4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"176.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"230.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"271.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"323.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"332.8 ft. MGO - General Observation - MAG COAT332.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start332.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start335.2 ft. MWL - Water Level, 15 %of cross sectional area335.2 ft. AMH - Downstream Manhole, Survey Begins - 02 1083335.2 ft. MWM - Water Mark, 20 %of cross sectional area335.2 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
158.3TFC
2.4MGOMAG COAT
0MWL
258.2TFC
0AMH02 1083
12.1TF
334.9SSS
2.4SAP
0MWM
2.4SSS
306.7TFC
335.2AMH02 1084
209.8TF
334.7SAP
63.9TF
104.9TFC
0MGOCONNECTION AT MH 9 O'CLOCK

Properties (4)

additional_info
SC346761
custom_field_two
3
customer
LACSD
datetime
2017-12-20T00:16:48-08:00