Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 6, 2017, 07:52 AM
  • A 0714_A 0713 _06122017_000546.mp4

Date
12/05/2017
W/O
674024
Weather
Dry
Operator/Surveyor
ERUIZ
Sewer ID
Z00316
PipeID
P07923
Time
11:52 PM
Certificate
123456
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5152
Sewer Name
A JOA-1A DISTRICT 21 INTERCEPTOR
City
POMONA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
14
Purpose
Routine Assessment
Project
WO_674024_TV21041_DEC2017
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
A 0714
Downstream MH
A 0713
Dir. of Survey
Downstream
Length Surveyed
208.7 ft.
Total Length
208.7 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
7
Pipe schematic from manhole A 0714 to A 0713
MH: A 0714MH: A 0713downstream0 ft. AMH - Upstream Manhole, Survey Begins - A 07140 ft. MWL - Water Level, 55 %of cross sectional area0 ft. MWM - Water Mark, 55 %of cross sectional area10 ft. MGO - General Observation - MAGNESIUM COATING START19.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start204.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish208.7 ft. AMH - Downstream Manhole, Survey Ends - A 0713

Observation photos (1)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    19.7 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
19.7SAP
204.6SAP
0AMHA 0714
208.7AMHA 0713
0MWL
0MWM
10MGOMAGNESIUM COATING START

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2017-12-05T23:52:24-08:00
sewer_category
Gravity
year_laid
26232