Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 23, 2015, 10:00 AM
  • 15 0655_15 0654_20151123_021401.mp4

Date
11/23/2015
W/O
531432
Weather
Dry
Operator/Surveyor
ERU
Sewer ID
Z00606
PipeID
P12927
Time
2:00 AM
Certificate
123456
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K2287
Sewer Name
15 GRAND AVENUE TRUNK
City
SAN GABRIEL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
10
Purpose
Routine Assessment
Project
WO_531423_TV15027_OCT2015
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
15 0655
Downstream MH
15 0654
Dir. of Survey
Downstream
Length Surveyed
224.9 ft.
Total Length
224.9 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 15 0655 to 15 0654
MH: 15 0655MH: 15 0654downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 OCLOCK ACTIVE0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02000 ft. MWM - Water Mark, 25 %of cross sectional area3.8 ft. MGO - General Observation - MAG COAT 30%3.8 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start14.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"17.5 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"26.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"39.9 ft. MGO - General Observation - MAG PEELING FROM SURFACE60.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"66.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"91.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"115.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"145.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"188 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"215.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"219.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"221 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish224.9 ft. AMH - Downstream Manhole, Survey Ends - 0214

Observation photos (1)

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    3.8 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
0MGOCONNECTION AT MH 9 OCLOCK ACTIVE
0MWL
66.3TFC
60.7TFA
145.8TFA
219.1TFA
0AMH0200
3.8MGOMAG COAT 30%
17.5TBA
3.8SAV
91.5TFC
221SAV
26.8TFA
115.5TFA
39.9MGOMAG PEELING FROM SURFACE
14.6TFC
0MWM
215.4TFC
224.9AMH0214
188TFC

Properties (5)

additional_info
SC205369
custom_field_two
3
customer
LACSD
datetime
2015-11-23T02:00:49-08:00
sewer_category
GRAVITY