Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 7, 2017, 10:47 AM
  • 29 0232_29 0063A_07122017_024738.mp4

Date
12/07/2017
W/O
674428
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01015
PipeID
P24135
Time
2:47 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5263
Sewer Name
29 EASTSIDE INTERCEPTOR SEWER
City
SIGNAL HILL
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
02
Purpose
Routine Assessment
Project
WO_674428_TV29080_DEC2017
Sewer Type
Gravity
Material
CIP
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0063A
Downstream MH
29 0232
Dir. of Survey
Upstream
Length Surveyed
164.8 ft.
Total Length
164.8 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole 29 0063A to 29 0232
MH: 29 0063AMH: 29 0232upstream0 ft. AMH - Upstream Manhole, Survey Ends - 29 02328 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6"70.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"72.4 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6"95.9 ft. MMC - Material Change, Vitrified clay pipe105.8 ft. MMC - Material Change, CIP152.8 ft. SCP - Surface Corrosion Metal Pipe, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish153.5 ft. JOL - Joint Offset Large161.7 ft. SCP - Surface Corrosion Metal Pipe, from 07 to 05 o'clock, within 8 inches of joint: YES, Start161.7 ft. MGO - General Observation - DROP CONNECTION164.7 ft. MWM - Water Mark, 15 %of cross sectional area164.8 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK164.8 ft. MWL - Water Level, 5 %of cross sectional area164.8 ft. AMH - Downstream Manhole, Survey Begins - 29 0063A

Observation photos (3)

  • Joint Offset Large

    11.3 ft. - Joint Offset Large

  • Material Change, CIP

    59 ft. - Material Change, CIP

  • Material Change, Vitrified clay pipe

    68.9 ft. - Material Change, Vitrified clay pipe

Observations (14)

DistanceCodeObservation
3.1SCP
94TF
3.1MGODROP CONNECTION
92.4TF
0MGOCONNECTION AT MH 3 O'CLOCK
59MMC
164.8AMH29 0232
11.3JOL
0MWL
0.1MWM
156.8TF
0AMH29 0063A
12SCP
68.9MMC

Properties (4)

additional_info
SC346292
custom_field_two
2
customer
LACSD
datetime
2017-12-07T02:47:18-08:00