18 0790_18 0789 __08112017_013607.mp4
3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
3 ft. - Surface Roughness Increased, from 11 to 01 o'clock, within 8 inches of joint: YES, Start
3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - MAG COATING
| Distance | Code | Observation |
|---|---|---|
| 0 | MWL | — |
| 3 | DAGS | — |
| 501.5 | DAGS | — |
| 503.2 | AMH | 18 0790 |
| 0 | AMH | 18 0789 |
| 501.5 | SSS | — |
| 0 | MWM | — |
| 3 | SRI | — |
| 502.9 | MGO | CONNECTION AT MH 9 O'CLOCK |
| 3 | SSS | MAG COATING |
| 501.5 | SRI | — |
| 502.9 | MGO | CONNECTION AT MH 3 O'CLOCK |