18 0780_18 0779 __08112017_040326.mp4
3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
3 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - MAG COATING
50.5 ft. - Surface Roughness Increased, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 321.3 | MGO | CONNECTION AT MH 9 O'CLOCK |
| 50.5 | SRI | — |
| 320 | SRI | — |
| 321.3 | AMH | 18 0779 |
| 247.8 | TB | — |
| 3 | DAGS | — |
| 3 | SSS | MAG COATING |
| 0 | MWM | — |
| 0 | AMH | 18 0780 |
| 0 | MWL | — |
| 320 | DAGS | — |
| 320 | SSS | — |