18 0788_18 0787 __08112017_001805.mp4
2.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
2.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - MAG COATING
| Distance | Code | Observation |
|---|---|---|
| 133.8 | DSC | — |
| 0 | MWM | — |
| 0 | MWL | — |
| 2.2 | DAGS | — |
| 266.2 | MGO | CONNECTION AT 9 OC |
| 264.6 | SSS | — |
| 0 | AMH | 18 0788 |
| 2.2 | SSS | MAG COATING |
| 264.6 | DSC | — |
| 266.3 | AMH | 18 0787 |
| 264.6 | DAGS | — |