18 0761_18 0760 _13112017_020115.mp4
2.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2.3 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

50.9 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
51 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish
| Distance | Code | Observation |
|---|---|---|
| 0 | MWM | — |
| 0 | AMH | 18 0761 |
| 50.9 | SAP | — |
| 2.3 | SSS | — |
| 0 | MWL | — |
| 0 | MGO | CONNECTION AT MH 9 O'CLOCK |
| 51 | SAV | — |
| 2.3 | SAV | — |
| 317.5 | AMH | 18 0760 |
| 317.5 | SAP | — |
| 0 | MGO | CONNECTION AT MH 3 O'CLOCK |
| 317.5 | SSS | — |