18 0789_18 0788 __08112017_000302.mp4
3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - MAG COATING
3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
221.3 ft. - Surface Roughness Increased, from 10 to 02 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 3 | SSS | MAG COATING |
| 270.4 | MGO | CONNECTION AT 3 OC |
| 244.7 | SRI | — |
| 0 | AMH | 18 0789 |
| 268.4 | DAGS | — |
| 221.3 | SRI | — |
| 0 | MWL | — |
| 0 | MWM | — |
| 268.4 | SSS | — |
| 270.4 | MGO | CONNECTION AT 9 OC |
| 270.4 | AMH | 18 0788 |
| 270.4 | MGO | RAGGING |
| 3 | DAGS | — |
| 0 | MGO | CONNECTIONS AT 3 AND 9 OC |