18 0767_18 0766 __09112017_001839.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - MAG COATING
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
2 ft. - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 8 0767 |
| 2 | SSS | MAG COATING |
| 329.4 | DAGS | — |
| 331.1 | MGO | CONNECTION AT MH 3 O'CLOCK |
| 0 | MWL | — |
| 301.5 | DSC | — |
| 329.4 | SRI | — |
| 2 | DAGS | — |
| 329.4 | SSS | — |
| 0 | MWM | — |
| 197.6 | DSC | — |
| 331.1 | AMH | 18 0766 |
| 2 | SRI | — |