18 0765_18 0764 __09112017_003653.mp4
1.8 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
2.9 ft. - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - MAG COATING
| Distance | Code | Observation |
|---|---|---|
| 289.8 | AMH | 18 0764 |
| 0 | MWM | — |
| 288.9 | DSC | — |
| 289.8 | MGO | CONNECTION AT MH 9 O'CLOCK |
| 61.3 | DSC | — |
| 288.9 | DAGS | — |
| 200.6 | TB | — |
| 2.9 | SRI | — |
| 1.8 | DAGS | — |
| 0 | MWL | — |
| 288.9 | SSS | — |
| 288.9 | SRI | — |
| 203.6 | TB | — |
| 0 | AMH | 18 0765 |
| 2.9 | SSS | MAG COATING |