Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 14, 2017, 07:06 PM
  • H 0389_H 0388 _141117_112214.mpg

Date
11/14/2017
W/O
630138
Weather
Dry
Operator/Surveyor
ERUIZ
Sewer ID
Z00177
PipeID
P10818
Time
11:06 AM
Certificate
123456
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5135
Sewer Name
H JOINT OUTFALL H - UNIT 5A
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
03
Purpose
Routine Assessment
Project
WO_630138_TV18073_NOV2017
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Width
54 in.
Upstream MH
H 0389
Downstream MH
H 0388
Dir. of Survey
Downstream
Length Surveyed
633.6 ft.
Total Length
633.6 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
6
Pipe schematic from manhole H 0389 to H 0388
MH: H 0389MH: H 0388downstream0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 038913.2 ft. MGO - General Observation - MAGNEZIUM H.O COATING start13.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start38.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 12"626.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish626.9 ft. MGO - General Observation - MAGNEZIUM H.O COATING finish632 ft. MGO - General Observation - SPALLING THROUGHOUT THE REACH, FROM 08 TO 04 O'CLOCK633.6 ft. AMH - Downstream Manhole, Survey Ends - H 0388

Observation photos (1)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    13.2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0MWL
626.9SAP
0MWM
0AMHH 0389
13.2MGOMAGNEZIUM H.O COATING start
13.2SAP
633.6AMHH 0388
626.9MGOMAGNEZIUM H.O COATING finish
38.1TFA
632MGOSPALLING THROUGHOUT THE REACH, FROM 08 TO 04 O'CLOCK

Properties (5)

additional_info
SC348344
custom_field_two
3
customer
LACSD
datetime
2017-11-14T11:06:58-08:00
sewer_category
Gravity