Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 30, 2017, 07:57 AM
  • B 0695_B 0694 _30112017_002358.mpg

Date
11/29/2017
W/O
674032
Weather
Dry
Operator/Surveyor
ERUIZ
Sewer ID
Z00110
PipeID
P09365
Time
11:57 PM
Certificate
123456
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5148
Sewer Name
B JOINT OUTFALL B - UNIT 8G
City
DUARTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
08
Purpose
Routine Assessment
Project
WO_674032_TV22155_DEC2017
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
B 0695
Downstream MH
B 0694
Dir. of Survey
Downstream
Length Surveyed
465.3 ft.
Total Length
465.3 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole B 0695 to B 0694
MH: B 0695MH: B 0694downstream0 ft. AMH - Upstream Manhole, Survey Begins - B 06950 ft. MWM - Water Mark, 45 %of cross sectional area0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH4.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start7.9 ft. MGO - General Observation - MAGNEZIUM H.O COATING start48 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"87.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"102.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"144.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"159.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8" - ROOTS202.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"214.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"263 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"268.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"317.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"320.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"378.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"381.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"396.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"463.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish465.3 ft. AMH - Downstream Manhole, Survey Ends - B 0694

Observation photos (1)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    4.4 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
263TFA
159.7TFAROOTS
144.7TFA
396.3TFC
317.4TFA
48TFA
4.4SAP
102.4TFA
7.9MGOMAGNEZIUM H.O COATING start
320.4TFA
463.9SAP
214.4TFA
465.3AMHB 0694
378.1TFA
0AMHB 0695
87.2TFA
268.7TFA
0MWM
202.2TFA
381.2TFA
0MWL
0MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH

Properties (4)

additional_info
SC346458
custom_field_two
3
customer
LACSD
datetime
2017-11-29T23:57:12-08:00