Section#3_C 0350_C 0349__12152017__G6883.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Reinforcement Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
208.6 ft. - General Photograph
399.2 ft. - Infiltration Dripper, from 11 to 02 o'clock, within 8 inches of joint: YES
399.3 ft. - General Photograph
399.3 ft. - General Photograph
| Distance | Code | Observation |
|---|---|---|
| 2 | SSS | — |
| 2 | SAV | — |
| 399.2 | SRV | — |
| 399.2 | SSS | — |
| 399.2 | SAP | — |
| 0 | MWL | — |
| 399.2 | SAV | — |
| 399.2 | ID | — |
| 2 | SAP | — |
| 208.6 | MGP | — |
| 399.3 | MGP | — |
| 2 | SRV | — |
| 0 | AMH | 9:08 AM |
| 0 | MWM | — |
| 399.3 | MGP | — |
| 2 | SRP | — |
| 399.3 | MSA | NOT ENOUGH FLOW |
| 399.2 | SRP | — |