Section#3_C 0351_C 0350__12142017__G6882.mp4
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - REINFORCEMENT VISIBLE
59.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
304.2 ft. - General Photograph
306.7 ft. - General Photograph
520.8 ft. - General Photograph
593.9 ft. - General Photograph
609.2 ft. - General Photograph - REINFORCEMENT
650.3 ft. - General Photograph
650.6 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES
691.6 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 690.8 | SRV | — |
| 706.3 | MGO | ACTIVE CONN @ MH 3 O'CLOCK |
| 691.6 | SRC | — |
| 0.1 | MWM | — |
| 306.7 | MGP | — |
| 690.8 | SAV | — |
| 650.3 | MGP | — |
| 690.8 | SAP | — |
| 593.9 | MGP | — |
| 59.9 | SAP | — |
| 609.2 | MGP | REINFORCEMENT |
| 650.2 | MGP | — |
| 650.6 | SRV | — |
| 304.2 | MGP | — |
| 711.5 | AMH | 3:27 PM |
| 520.8 | MGP | — |
| 690.8 | SSS | — |
| 0 | AMH | 2:04 PM |
| 2 | SSS | — |
| 2 | SRV | — |
| 2 | SAV | REINFORCEMENT VISIBLE |
| 0.1 | MWL | — |