Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 27, 2017, 05:47 AM
  • A 0892_A 0891 _26102017_224727.mp4

Date
10/26/2017
W/O
668909
Weather
Dry
Operator/Surveyor
JUAN B
Sewer ID
Z00318
PipeID
P07986
Time
10:47 PM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5005
Sewer Name
A JOA-1A FLORENCE AVENUE INTERCEPTOR
City
NORWALK
Loc. details
Railway
Location Code
L
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
29
Purpose
Routine Assessment
Project
WO_668909_TV18067_NOV2017
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
A 0892
Downstream MH
A 0891
Dir. of Survey
Downstream
Length Surveyed
167.5 ft.
Total Length
167.5 ft.
Structural Index
3
Structural Quick
3F2F
Structural Rating
165
O&M Index
2
O&M Quick
2400
O&M Rating
8
Overall Index
2
Overall Quick
Overall Rating
173
Pipe schematic from manhole A 0892 to A 0891
MH: A 0892MH: A 0891downstream0 ft. AMH - Upstream Manhole, Survey Begins - A 08920 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area2 ft. SRP - Surface Reinforcement Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - MAG COATING3.7 ft. MGO - General Observation - MAG COATING3.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start18.4 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS49.9 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - DEBRIS166 ft. SRP - Surface Reinforcement Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish167.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish167.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish167.5 ft. AMH - Downstream Manhole, Survey Ends - A 0891

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - MAG COATING

    3.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - MAG COATING

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    3.7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
3.7SSSMAG COATING
2SRP
49.9DSZDEBRIS
0AMHA 0892
167.1SSS
0MWM
3.7MGOMAG COATING
18.4DSZDEBRIS
0MWL
167.1DAGS
3.7DAGS
167.5AMHA 0891
166SRP

Properties (6)

additional_info
SC350359
custom_field_two
3
customer
LACSD
datetime
2017-10-26T22:47:02-07:00
sewer_category
Gravity
year_laid
31499