Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 23, 2017, 09:09 AM
  • 02 1368_02 1367 _102317_021117.mp4

Date
10/23/2017
W/O
668911
Weather
Dry
Operator/Surveyor
JUAN B
Sewer ID
Z00277
PipeID
P03891
Time
2:09 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K4997
Sewer Name
02 JANE STREET BRANCH TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
11A
Purpose
Routine Assessment
Project
WO_668911_TV02072_NOV2017
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
02 1367
Downstream MH
02 1368
Dir. of Survey
Upstream
Length Surveyed
308.3 ft.
Total Length
308.3 ft.
Structural Index
3
Structural Quick
3U2K
Structural Rating
448
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
450
Pipe schematic from manhole 02 1367 to 02 1368
MH: 02 1367MH: 02 1368upstream0 ft. AMH - Upstream Manhole, Survey Ends - 02 13681.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish1.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish58.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES72.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"74.9 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6", 6"79.2 ft. CM - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES85.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish89.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"123 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"133.5 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES134.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"160.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish176.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"197.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"221.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN238.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"275 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"297.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start300.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start303.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES306.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start306.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start306.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start308.3 ft. AMH - Downstream Manhole, Survey Begins - 02 1367308.3 ft. MWM - Water Mark, 30 %of cross sectional area308.3 ft. MWL - Water Level, 10 %of cross sectional area

Observation photos (7)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    1.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    4.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    11.1 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    174.8 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES

    229.1 ft. - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    249.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (28)

DistanceCodeObservation
110.8TF
307.2DAGS
0AMH02 1367
308.3AMH02 1368
307SSS
147.9CM
229.1CM
235.9TFC
69.4TF
173.8TF
1.9DAGS
4.9CM
7.8CM
87TFOPEN
2CM
0MWM
233.4TFC
218.6TF
131.5TF
174.8CL
2SSS
249.5CM
0MWL
307CM
11.1CM
33.3TF
185.3TF
222.8CM

Properties (5)

additional_info
SC350351
custom_field_two
3
customer
LACSD
datetime
2017-10-23T02:09:48-07:00
sewer_category
Gravity