Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 28, 2017, 07:17 AM
  • 22 0229_22 0228 _27112017_233108.mp4

Date
11/27/2017
W/O
674548
Weather
Dry
Operator/Surveyor
ERUIZ
Sewer ID
Z00793
PipeID
P16510
Time
11:17 PM
Certificate
123456
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5143
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
WO_674584_TV22017_DEC2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
22 0229
Downstream MH
22 0228
Dir. of Survey
Downstream
Length Surveyed
201.6 ft.
Total Length
201.6 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
6
Pipe schematic from manhole 22 0229 to 22 0228
MH: 22 0229MH: 22 0228downstream0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MGO - General Observation - LATERAL AT MH 3 OCLOCK0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02295.7 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start21.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"31.1 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish31.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start34.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"69.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"82.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"118.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"130.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"166.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"179.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"198.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish201.6 ft. AMH - Downstream Manhole, Survey Ends - 22 0228

Observation photos (2)

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    5.7 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    31.1 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
31.1SAV
166.5TF
21.8TFC
179.5TFC
82.4TFC
5.7SAV
0MWL
34.3TFC
0MGOLATERAL AT MH 3 OCLOCK
0MWM
130.2TFC
31.1SAP
201.6AMH22 0228
69.8TFC
0AMH22 0229
118.5TFC
198.8SAP

Properties (4)

additional_info
SC346453
custom_field_two
3
customer
LACSD
datetime
2017-11-27T23:17:45-08:00