Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 28, 2017, 08:11 AM
  • 22 0233_22 0232 _28112017_003707.mp4

Date
11/28/2017
W/O
674548
Weather
Dry
Operator/Surveyor
ERUIZ
Sewer ID
Z00793
PipeID
P16514
Time
12:11 AM
Certificate
123456
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5143
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
WO_674584_TV22017_DEC2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
22 0232
Downstream MH
22 0233
Dir. of Survey
Upstream
Length Surveyed
394.6 ft.
Total Length
394.6 ft.
Structural Index
4
Structural Quick
5131
Structural Rating
8
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
8
Pipe schematic from manhole 22 0232 to 22 0233
MH: 22 0232MH: 22 0233upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 02330 ft. MGO - General Observation - LATERAL AT MH 3 OCLOCK1.5 ft. MGO - General Observation - LATERAL AT MH 9 OCLOCK4.5 ft. SRV - Surface Reinforcement Visible, from 01 to 04 o'clock, within 8 inches of joint: YES4.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish45.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"57.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"94.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"118.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"166.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"178.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"214.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"227 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"262.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"274.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"307.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"323.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"356.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"370.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"387.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start394.6 ft. MWL - Water Level, 40 %of cross sectional area394.6 ft. AMH - Downstream Manhole, Survey Begins - 22 0232394.6 ft. MWM - Water Mark, 40 %of cross sectional area

Observation photos (2)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    7 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 01 to 04 o'clock, within 8 inches of joint: YES

    390.1 ft. - Surface Reinforcement Visible, from 01 to 04 o'clock, within 8 inches of joint: YES

Observations (23)

DistanceCodeObservation
215.8TFC
227.9TF
180.1TF
394.6AMH22 0233
37.7TF
120.1TFC
167.6TFA
0MWL
336.7TF
394.6MGOLATERAL AT MH 3 OCLOCK
71.3TF
0AMH22 0232
348.9TFC
390.1SRV
23.8TFA
7SAP
300.4TFC
86.7TF
390.1SAP
0MWM
131.7TFC
393.1MGOLATERAL AT MH 9 OCLOCK
276.5TFC

Properties (4)

additional_info
SC346453
custom_field_two
2
customer
LACSD
datetime
2017-11-28T00:11:36-08:00