Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 2, 2017, 11:02 AM
  • 02 0108_02 0107 __02112017_040320.mp4

Date
11/02/2017
W/O
668604
Weather
Dry
Operator/Surveyor
JUAN B
Sewer ID
Z00237
PipeID
P02275
Time
4:02 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5165
Sewer Name
02 BELLFLOWER TRUNK
City
BELLFLOWER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
38
Purpose
Routine Assessment
Project
WO_668604_TV02350_NOV2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
02 0108
Downstream MH
02 0107
Dir. of Survey
Downstream
Length Surveyed
364.3 ft.
Total Length
364.3 ft.
Structural Index
3
Structural Quick
4531
Structural Rating
27
O&M Index
2
O&M Quick
2300
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
33
Pipe schematic from manhole 02 0108 to 02 0107
MH: 02 0108MH: 02 0107downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 01082 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. FM - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES2.1 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES4.7 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES7.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start19.4 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6"57.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"84 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"107.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"118.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"170.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"172.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"190.6 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Start197.4 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start215.2 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish215.2 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Finish225.8 ft. MWLS - Water Level, Sag in pipe, 20 %of cross sectional area, Start225.8 ft. FM - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES232.4 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start232.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"232.8 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES235.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"236.8 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish236.8 ft. MWLS - Water Level, Sag in pipe, 20 %of cross sectional area, Finish247.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"274 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"319.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"346.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"349 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"362.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish362.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish364.3 ft. AMH - Downstream Manhole, Survey Ends - 02 0107364.3 ft. MGO - General Observation - CEONNECTION AT 9 OC

Observation photos (9)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES

    2 ft. - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    2.1 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    4.7 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Water Level, Sag in pipe, 15 %of cross sectional area, Start

    190.6 ft. - Water Level, Sag in pipe, 15 %of cross sectional area, Start

  • Water Level, Sag in pipe, 20 %of cross sectional area, Start

    225.8 ft. - Water Level, Sag in pipe, 20 %of cross sectional area, Start

  • Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

    225.8 ft. - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    232.8 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (36)

DistanceCodeObservation
362.9DAGS
172.7TF
4.7FM
215.2DSC
2DAGS
118.9TFA
2FM
2.1FM
235.6TF
236.8DSC
232.8TF
215.2MWLS
84TF
0MWL
362.9CM
225.8MWLS
232.8FM
197.4DSC
0MWM
232.4DSC
19.4TB
190.6MWLS
319.6TF
0AMH02 0108
349TF
364.3AMH02 0107
274TF
107.7TF
170.3TFC
57.5TF
236.8MWLS
225.8FM
247.1TF
346.1TFC
364.3MGOCEONNECTION AT 9 OC
7.9CM

Properties (4)

additional_info
SC350365
custom_field_two
2
customer
LACSD
datetime
2017-11-02T04:02:40-07:00