Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 16, 2016, 10:18 AM
  • B 0568_B 0567 _11162016_023314.mp4

Date
11/16/2016
W/O
602270
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00101
PipeID
P09116
Time
2:18 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3880
Sewer Name
B JOINT OUTFALL B - UNIT 7
City
MONTEREY PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
26
Purpose
Routine Assessment
Project
WO_602270_TV15120_NOV2016
Material
CIP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
B 0568
Downstream MH
B 0567
Dir. of Survey
Downstream
Length Surveyed
303.1 ft.
Total Length
303.1 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
1
O&M Quick
2113
O&M Rating
5
Overall Index
2
Overall Quick
Overall Rating
8
Pipe schematic from manhole B 0568 to B 0567
MH: B 0568MH: B 0567downstream0 ft. MGO - General Observation - LATERAL AT MH 9 O CLOCK ACTIVE0 ft. MGO - General Observation - LATERAL AT MH 3 O CLOCK ACTIVE0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. VC - Vermin Cockroach, within 8 inches of joint: NO - AT MH0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 05682.9 ft. SCP - Surface Corrosion Metal Pipe, from 07 to 05 o'clock, within 8 inches of joint: YES, Start2.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start270.4 ft. VC - Vermin Cockroach, within 8 inches of joint: NO300.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish300.4 ft. SCP - Surface Corrosion Metal Pipe, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish303.1 ft. VC - Vermin Cockroach, within 8 inches of joint: NO - AT MH303.1 ft. MGO - General Observation - LATERAL AT MH 9 O CLOCK ACTIVE303.1 ft. AMH - Downstream Manhole, Survey Ends - B 0567303.1 ft. MGO - General Observation - LATERAL AT MH 9 O CLOCK MADE

Observation photos (2)

  • Surface Corrosion Metal Pipe, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Corrosion Metal Pipe, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
303.1VCAT MH
303.1MGOLATERAL AT MH 9 O CLOCK ACTIVE
270.4VC
2.9SCP
303.1AMHB 0567
0MGOLATERAL AT MH 9 O CLOCK ACTIVE
0MGOLATERAL AT MH 3 O CLOCK ACTIVE
300.4DAGS
0MWL
300.4SCP
303.1MGOLATERAL AT MH 9 O CLOCK MADE
2.9DAGS
0VCAT MH
0MWM
0AMHB 0568

Properties (5)

additional_info
SC305212
custom_field_two
3
customer
LACSD
datetime
2016-11-16T02:18:05-08:00
sewer_category
Gravity