Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 22, 2016, 09:39 AM
  • B 0565_B 0564 _11222016_015742.mp4

Date
11/22/2016
W/O
602270
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00101
PipeID
P09113
Time
1:39 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3885
Sewer Name
B JOINT OUTFALL B - UNIT 7
City
MONTEREY PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
26
Purpose
Routine Assessment
Project
WO_602270_TV15120_NOV2016
Material
CIP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
B 0565
Downstream MH
B 0564
Dir. of Survey
Downstream
Length Surveyed
344.1 ft.
Total Length
344.1 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
1
O&M Quick
2113
O&M Rating
5
Overall Index
2
Overall Quick
Overall Rating
8
Pipe schematic from manhole B 0565 to B 0564
MH: B 0565MH: B 0564downstream0 ft. AMH - Upstream Manhole, Survey Begins - B 05650 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. VC - Vermin Cockroach, within 8 inches of joint: NO - AT MH0 ft. MWL - Water Level, 5 %of cross sectional area0.1 ft. MGO - General Observation - LATERAL AT MH 9 O CLOCK MADE2.1 ft. SCP - Surface Corrosion Metal Pipe, from 07 to 05 o'clock, within 8 inches of joint: YES, Start2.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start260 ft. VC - Vermin Cockroach, within 8 inches of joint: NO341.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish341.7 ft. SCP - Surface Corrosion Metal Pipe, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish344.1 ft. AMH - Downstream Manhole, Survey Ends - B 0564344.1 ft. VC - Vermin Cockroach, within 8 inches of joint: NO - AT MH

Observation photos (2)

  • Surface Corrosion Metal Pipe, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Corrosion Metal Pipe, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
260VC
341.7DAGS
2.1SCP
0AMHB 0565
0MWM
0VCAT MH
344.1AMHB 0564
341.7SCP
0.1MGOLATERAL AT MH 9 O CLOCK MADE
0MWL
344.1VCAT MH
2.1DAGS

Properties (5)

additional_info
SC305218
custom_field_two
3
customer
LACSD
datetime
2016-11-22T01:39:35-08:00
sewer_category
Gravity