Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 29, 2016, 05:52 AM
  • 15 0268_15 0267_20160428_231148.mp4

Date
04/28/2016
W/O
568734
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00627
PipeID
P12191
Time
10:52 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3334
Sewer Name
15 SAN JOSE CREEK TRUNK
City
INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
37
Purpose
Routine Assessment
Project
WO_568734_TV15001_MAY2016
Material
Reinforced Concrete Pipe
Shape
Circular
Height
15 in.
Upstream MH
15 0268
Downstream MH
15 0267
Dir. of Survey
Downstream
Length Surveyed
468.2 ft.
Total Length
468.2 ft.
Structural Index
2
Structural Quick
2O00
Structural Rating
158
O&M Index
2
O&M Quick
2R00
O&M Rating
192
Overall Index
2
Overall Quick
Overall Rating
350
Pipe schematic from manhole 15 0268 to 15 0267
MH: 15 0268MH: 15 0267downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 02682 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start9 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"70.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start105.2 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"111 ft. MGO - General Observation - MAG COATING 40%258.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"364 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"433.2 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"436.3 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"466.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish466.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish468.2 ft. AMH - Downstream Manhole, Survey Ends - 15 0267

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    70.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
70.1SSS
468.2AMH15 0267
0MWM
258.7TFC
466.2SSS
9TBC
0MWL
0AMH15 0268
433.2TBA
466.2DAGS
105.2TB
364TBC
2DAGS
111MGOMAG COATING 40%
436.3TBC

Properties (5)

additional_info
SC305608
custom_field_two
4
customer
LACSD
datetime
2016-04-28T22:52:36-07:00
sewer_category
SIPHON