Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 10, 2016, 06:14 AM
  • 15 0232A_15 0232_20160509_232252.mp4

Date
05/09/2016
W/O
568734
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00627
PipeID
P12154
Time
11:14 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3344
Sewer Name
15 SAN JOSE CREEK TRUNK
City
INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
33
Purpose
Routine Assessment
Project
WO_568734_TV15001_MAY2016
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Upstream MH
15 0232A
Downstream MH
15 0232
Dir. of Survey
Downstream
Length Surveyed
182.9 ft.
Total Length
182.9 ft.
Structural Index
3
Structural Quick
3L2E
Structural Rating
263
O&M Index
2
O&M Quick
2F00
O&M Rating
72
Overall Index
3
Overall Quick
Overall Rating
335
Pipe schematic from manhole 15 0232A to 15 0232
MH: 15 0232AMH: 15 0232downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 15 0232A0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start27.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start27.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start103.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"181.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish181.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish181.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish181.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish181.6 ft. MGO - General Observation - COCKROACHES IN MANHOLE182.9 ft. AMH - Downstream Manhole, Survey Ends - 15 0232

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    27.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    27.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    181.6 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (16)

DistanceCodeObservation
0MWL
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
0AMH15 0232A
181.6DAGS
181.6SSS
182.9AMH15 0232
2SAV
181.6SAP
181.6SAV
2DAGS
181.6MGOCOCKROACHES IN MANHOLE
0MWM
103.8TFC
0MGOCOCKROACHES IN MANHOLE
27.2SAP
27.2SSS

Properties (5)

additional_info
SC305623
custom_field_two
2
customer
LACSD
datetime
2016-05-09T23:14:10-07:00
sewer_category
GRAVITY